Can't create sub-task using mouse


#1

Outlining with the keyboard works fine: press tab on a task and it becomes a sub-task. This does not work with the mouse: you can only drag tasks into projects, not other tasks.


#2

This is by design at the moment.

But when I get a chance (post 3.0 release) and add the option to hold down shift when dragging to drop ontop of an item like you could in TaskPaper 2.


#3

Why not use two trop targets? That already works for items inside projects, though the second one is a little weird, as the text ends up nowhere near the red line but as a new aunt.



#4

I feel like two drop targets starts to feel to finicky. But in the latest 3.1 dev release you can hold shift down to drop ON.